ys_pl_CBK1a@32 < 20190226101135-009311 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 6.96e-07 g/g
[Sr] 0.000113 g/g
[Y] 2.94e-07 g/g
[Zr] 1.85e-06 g/g
[Nb] 2.86e-07 g/g
[Ba] 3.53e-05 g/g
[La] 9.99e-08 g/g
[Ce] 1.77e-07 g/g
[Pr] 1.57e-08 g/g
[Nd] 1.19e-07 g/g
[Sm] 5.14e-08 g/g
[Eu] 6.71e-07 g/g
[Gd] 1.6e-08 g/g
[Dy] 3.24e-08 g/g
[Er] 1.93e-08 g/g
[Yb] 4.68e-08 g/g
[Lu] 2.41e-08 g/g
[Hf] 3.85e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id