ys_pl_CBK1a@35 < 20190226101135-905904 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 8.64e-07 g/g
[Sr] 9.36e-05 g/g
[Y] 1.28e-06 g/g
[Zr] 3.88e-06 g/g
[Nb] 2.72e-07 g/g
[Ba] 3.91e-05 g/g
[La] 2.29e-07 g/g
[Ce] 6.07e-07 g/g
[Pr] 8.59e-08 g/g
[Nd] 4.61e-07 g/g
[Sm] 1.27e-07 g/g
[Eu] 6.21e-07 g/g
[Gd] 1.3e-07 g/g
[Dy] 1.82e-07 g/g
[Er] 1.43e-07 g/g
[Yb] 1.27e-07 g/g
[Lu] 5.27e-08 g/g
[Hf] 1.65e-07 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id