ys_ol_CBK1a@28 < 20190226101136-210573 > pub
  • technique: SIMS
  • device: SIMS Cameca ims-5f
  • operator: Shimaki
  • modified at 2019-02-26
  • stone: TS CBK1-a
  • references:
    • DREAM (2019) Summary of the Chelyabinsk project (Nakamura et al., 2019), DREAM Digital Document, 19, 20190326083025-844154. more
measured value uncertainty unit description
[Li] 1.9e-06 g/g
[Sr] 2.75e-06 g/g
[Y] 3.73e-07 g/g
[Zr] 8.87e-07 g/g
[Nb] 1.25e-07 g/g
[Ba] 1.23e-06 g/g
[La] 4.7e-08 g/g
[Ce] 1.34e-07 g/g
[Pr] 2.35e-08 g/g
[Nd] 7.86e-08 g/g
[Sm] 4.61e-08 g/g
[Eu] 1.86e-08 g/g
[Gd] 5.75e-08 g/g
[Dy] 2.54e-08 g/g
[Er] 4.74e-08 g/g
[Yb] 3.19e-08 g/g
[Lu] 1.35e-08 g/g
[Hf] 5.49e-08 g/g
name global-id
Summary of the Chelyabinsk project (Nakamura et al., 2019) pub 20190326083025-844154
name spots global-id